Phase I Gate Update






As you can see by the pictures, the gate people finally came out. They cut the gate in half and then welded new hinges to the side that they cut off. They now move very easily and we shouldn't have the problems with the actuators that we had with the long heavy gates. Once they finish, the next step is to have them sand blasted and powder coated. After that they'll be installed for a test run to make sure everything works, before installing the actuators to the exit side.